dspConduct
Conduct Task Assignement to IGC Task
Use this page to Map an IGC™ Task to An Existing dspConduct™ Task .
To access this page:
- Select dspConduct > Design in the Navigation pane.
- Click the IGC Tasks icon.
- Click the Use Existing Tasks icon.
Field |
Description |
TASK ID |
Displays the dspConduct™ task assigned to the IGC™ task selected on the IGC Task page. dspConduct™ tasks that can be mapped to IGC™ tasks are either:
|
PUBLISHED |
If enabled, the task is published, i.e., synched into the dspConduct™ business process(es). If an error has occurred in the framework while attempting to map the IGC™ task to the existing dspConduct™ task an error message displays and this field is unchecked. Click the log link in the error message for more information. |